Construction of Chefe Sub –Catchment Waste Water Treatment Plant

The E & M design, supply, and installation, preparation of As-built drawing, operation, and maintenance manual.

Share :
  • Project: The E & M design, supply, and installation, preparation of As-built drawing, operation, and maintenance manual.
  • Categories: Water supply
  • Year: 2018
  • Scope of work: The E & M design, supply, and installation, preparation of As-built drawing, operation, and maintenance manual.
  • Owner:Addis Ababa Water and Sewerage Authority Water Supply and Sanitation Development And Rehabilitation Project Office